buy windows enterprise purchase windows xp pro buy microsoft access 2003 buy microsoft office 2010 buy excel 2003 download buy windows 2008 server online microsoft excel 2007 buy buy outlook express 2007 adobe framemaker 9 price buy microsoft office 2003 cheap corel draw 10 mac 3ds max pricing buy quicken 2010 deluxe download adobe after effects cs4 mac indesign for mac microsoft windows vista ultimate with sp2 (32bit) download 3ds max design 2010 cheap windows 7 download buy turbotax 2007 purchase microsoft office buy autocad electrical cheap buy vista home premium product key download wavelab buy windows 7 professional key buy 3ds max 2010 student buy autocad electrical 2010 cheap windows 7 home premium download adobe creative suite 4 master collection buy windows 2008 server r2 cheap norton ghost purchase microsoft access buy office onenote 2003 purchase windows 7 license download cs3 design standard microsoft money home and business 2009 get windows 7 ultimate 32bit microsoft works 9 product key windows vista ultimate price microsoft office 2008 price download corel draw x4 buy windows vista business product key buy windows 7 home premium oem buy windows vista ultimate license adobe premiere pro cs4 download autocad electrical 2010 system requirements adobe dreamweaver mac os x windows 7 professional cheapest price autodesk inventor lt buy cs4 design standard quickbooks enterprise discount steinberg cubase sx3 download buy microsoft office 2003 professional microsoft expression download windows 7 professional 32 bit download windows 7 ultimate discount buy 3ds max 2010 adobe production premium cs4 download adobe indesign cs4 mac adobe illustrator 10 download buy windows 7 ultimate 64 bit buy windows xp product key online microsoft visio 2007 pro buy windows 7 home premium cheap adobe cs4 master collection discount buy after effects cs4 mac buy cs4 master collection adobe font folio download autocad electrical 2009 download download microsoft office 2010 autodesk navisworks simulate 2009 buy autodesk inventor buy microsoft office 2003 standard windows 7 ultimate 64 bit product key download adobe premiere pro cs3 mac buy after effects cheap microsoft money 2007 deluxe download windows 7 ultimate oem price buy powerpoint 2003 online buy powerpoint 2007 online windows 7 ultimate 64 bit best price buy windows 7 digital download buy windows 7 professional 64 bit cheap dreamweaver download windows vista best price acrobat 9 download buy photoshop lightroom for mac buy indesign cs4 adobe acrobat 9 cheap buy adobe framemaker illustrator cs3 download download autosketch 9 cheap adobe cs4 design premium windows 7 ultimate licensing buy dvd moviefactory 6 download download microsoft office 2008 for mac windows 7 home premium best price quickbooks enterprise price buy premiere elements 7 windows r2 2008 buy ms visio 2007 adobe illustrator cs4 direct download buy microsoft expressions corel draw cost buy microsoft visual studio 2005 buy vista business online autocad electrical download buy adobe dreamweaver cs3 buy windows xp download pcanywhere download 12.5 purchase vista online adobe fireworks pricing download autodesk autocad 2009 windows 7 home premium full discount photoimpact pro 11 ms office enterprise 2007 download streets and trips 2010 cost microsoft expression studio 3 download download cubase 4 purchase corel draw 12 download microsoft office 2003 professional edition adobe cs4 master collection for mac windows vista business 64 bit sp2 cheap autocad 2010 buy adobe flash cs4 professional where to buy ms office 2003 adobe cs4 design premium mac download cheap adobe photoshop cs3 autodesk 3ds max price buy microsoft word 2003 online price of windows 7 ultimate buy ms powerpoint buy adobe indesign cs4 autocad mechanical 2009 download autocad architecture pricing adobe cs4 production premium download get buy windows 7 oem ultimate buy quicken cheap buy windows 7 online purchase acrobat 8 cheap cubase 5 purchase corel draw dvd moviefactory 6 download framemaker cost windows 7 64 bit price microsoft streets and trips 2010 price buy excel 2003 online adobe pagemaker buy microsoft word 2003 product key buy cubase le 4 cs3 master collection trial corel painter 9 for mac adobe premiere elements cheap microsoft autoroute 2007 download autocad architecture 2010 download cubase 5 cost download autocad electrical 2010 microsoft office project professional 2007 download adobe after effects cs3 download buy microsoft money plus home & business download microsoft access 2007 purchase windows 7 professional cheapest windows vista turbotax cheap autocad 3ds max 2010 buy onenote 2007 framemaker download adobe premiere pro price buy ms office 2003 online buy quickbooks pro 2009 windows enterprise price cubase 4 price adobe presenter 7 download buy microsoft outlook 2007 only buy lightroom 2.5 corel draw price pcanywhere buy buy premiere pro cs3 buy windows xp sp3 oem buy adobe premiere pro for mac download streets and trips 2009 download adobe indesign cs4 dreamweaver for mac price buy maya 2009 buy microsoft office 2003 download windows 7 64 bit oem price adobe fireworks price microsoft visio 2003 price maya price 2009 adobe after effects cs4 download cheap autocad electrical 2010 adobe indesign cs4 windows full version cheap adobe photoshop adobe contribute review microsoft excel 2007 product key buy word 2007 online buy visual studio 2003 coreldraw for mac download microsoft encarta premium 2009 dvd buy wavelab 6 download after effects cs4 microsoft office 2003 download full version buy quicken 2006 download microsoft digital image suite 2006 adobe premiere pro cs4 buy adobe flash for mac windows 7 buy license buy acrobat 9 pro buy cubase 5 studio cheapest windows 7 ultimate oem download adobe premiere pro cs4 buy adobe audition 3.0 microsoft office 2003 pro oem microsoft windows 7 home premium best price cheapest windows 7 pro autodesk 3ds max design price photoshop elements 8 where to buy microsoft word 2003 price autodesk mudbox 2010 download buy microsoft vista product key buy adobe premiere pro mac buy ms word 2007 microsoft mappoint europe 2004 download architecture software buy dreamweaver cs3 for mac buy adobe flash player 10 cheap adobe illustrator cs4 should i buy windows 7 now cheapest windows 7 ultimate full version buy adobe illustrator mac dreamweaver mac system requirements buy microsoft office 2003 online buy photoshop elements 8 autodesk 3ds max design 2010 download buy adobe illustrator 10 symantec pcanywhere download adobe after effects trial buy vista product key online purchase acrobat professional buy photoshop cs3 extended buy steinberg nuendo 4 autodesk inventor professional suite 2010 buy vista get windows 7 turbotax discount code buy autodesk 3ds max 2009 adobe creative suite 3 design premium download buy windows xp sp2 buy autocad inventor 2010 microsoft excel 2003 product key adobe captivate oem buy adobe captivate 4 photoshop for cheap buy microsoft encarta cheap windows 7 software download corel painter x mac download quicken 2010 adobe cs4 web standard download windows 7 pro cheapest windows vista business 64 bit iso buy norton ghost online buy windows 7 license online buy microsoft vista buy office 2003 license adobe photoshop best buy adobe premiere pro cs4 mac download after effects mac system requirements norton 360 download buy microsoft office enterprise 2007 purchase windows 7 activation key buy adobe illustrator windows 2003 datacenter licensing turbotax 2008 download buy adobe fireworks autodesk inventor lt download adobe audition buy windows 7 digital download download robohelp 8 buy windows 7 pro full adobe after effects cs4 sale adobe cs3 master collection price download corel dvd moviefactory 7 buy adobe cs4 master collection buy adobe robohelp 8 download adobe indesign cs3 autocad inventor price buy windows 7 professional 64 bit oem windows 2008 enterprise cost windows 7 pro download adobe indesign for mac buy windows 7 license key buy adobe flash 8 download adobe creative suite 4 design premium windows 2003 enterprise edition download buy ms visual studio 2008 buy corel draw 12 buy windows 2008 server buy microsoft project 2000 corel draw 14 mac cheap maya software windows 2008 datacenter edition buy office 2003 download purchase windows xp download windows xp sp3 download buy microsoft visio professional photoshop elements download cubase 5 buy microsoft onenote price buy autocad navisworks price buy autocad architecture 2010 buy maya 2008 buy autosketch 10 quicken rental property manager 2009 coupon buy adobe audition 3 get autodesk 3ds max 2010 download adobe flash cs4 buy windows 7 home premium family pack buy adobe illustrator student microsoft office 2008 for mac license buy photoshop cs2 download cubase sx3 download adobe flash cs4 for mac download download autocad electrical windows 7 buy online download buy pagemaker 6.5 cheapest windows xp home edition buy office 2003 pro buy office 2003 product key mappoint europe 2010 buy maya 2010 buy outlook 2007 download adobe cs4 design premium mac adobe cs4 web premium download autodesk autocad price autocad mechanical best price cheap windows 7 oem microsoft office 2010 download cheap access 2007 adobe indesign cs3 price windows 7 professional 32-bit oem adobe illustrator cs4 download purchase cubase 4 buy encarta premium 2009 purchase windows 7 volume license microsoft office 2003 best price buy photoshop elements cheap cheap illustrator cs3 buy microsoft excel product key adobe photoshop best price download microsoft autoroute 2007 europe buy windows xp home adobe creative suite 4 master collection download
Bookmark and Share

Trail of Delays

July 23rd, 2008 by Reid Rector

In the last two weeks, 8 peacekeepers have been killed in Darfur. Commenting on the loss of 5 Rwandan soldiers, Rwanda Defense Force spokesman Jill Rutaremara said:

I imagine if UNAMID had better equipment, for instance, if they had attack helicopters, if they had surveillance aircraft and other logistical support, and if their number was 26,000, as it was planned, I’m sure the situation would not be the same on the ground.

These comments underscore the relationship between the unacceptably slow deployment of UNAMID, and the dangerous situation on the ground in Darfur today. UNAMID was supposed to add 17,000 additional troops to the 9,000 AMIS troops already on the ground. To date, less than 1,000 troops—or less than 6% of the total—have actually been added

But what is the story behind this unacceptably slow deployment? A review of published UN reports shows an embarrassingly inadequate effort so far:

  • According to the most recent UN report, “the only deployment to be completed since the transfer of authority (from AMIS to UNAMID) has been the Egyptian Signals Company, which deployed in May 2008.”
  • Since that report, a Chinese engineering unit composed of 315 individuals has also deployed after months of waiting for their equipment to arrive in Darfur. The Chinese Engineering Company’s equipment was originally scheduled to arrive in Nyala by the end of December 2007. The deadline was pushed back to April, and the equipment finally arrived just before the July 7 Secretary General’s Report.
  • The Egyptian Engineering Company’s deployment was delayed 4 times from mid-February to July 2008 and is now delayed indefinitely until damaged equipment is repaired.
  • The Egyptian Transport Unit was delayed 5 times from mid-February to late August 2008, and the Bangladeshi Logistics Company was also delayed to August. The original deadline was late March 2008.
  • The first Ethiopian battalion – approximately 800 troops originally scheduled to be fully deployed by 15 May 2008 –is now slated for deployment “before October.”

This is simply unacceptable. The people of Darfur desperately need a comprehensive and rapid deployment. Although UNAMID provides the framework for an appropriate response, a robust mandate is not enough. UNAMID needs supplies, equipment, police, hospitals, and military support now – not tomorrow, if it is to satisfactorily fulfill its mandate.

Both the UN and the Government of Sudan bear responsibility for these delays. UNAMID needs political support from UN member states to overcome hurdles erected by the Government of Sudan. Once this support is granted, change will come at a more rapid pace; deadlines will come closer to being met; lives will be saved; and Darfur will move one step closer to peace.

UNAMID Deployment Deadlines and Delays by Unit

(All quotes taken from Secretary General’s Reports on UNAMID)

Chinese

  • Engineering company
    • Dec. 24, 2007:
      • “…equipment is expected to arrive by the end of Dec. The cargo readiness date for the main body of the unit has yet to be provided, and the unit’s full deployment is expected by the end of Mar. 2008.”
    • Feb. 14, 2008:
      • “…(equipment) is currently being loaded and shipped”
    • Mar. 25, 2008:
      • “The unit’s main body…is scheduled to completely its deployment to Nyala by 5 Apr.”
    • Apr. 14, 2008:
      • “The main body of the Chinese engineer company and its equipment are expected to arrive in Darfur in Apr.”
    • May 9, 2008:
      • “While the advance party…has been on the ground for several months, the main body of the unit can deploy only once the movement of its equipment from Port Sudan to Darfur is completed. Some 75% of the equipment is now en route to Darfur, but 25% remains in Port Sudan.”
    • July 7, 2008:
      • “Sufficient contingent-owned equipment…has now arrived at the Nyala supercamp for the advance party to build the main body’s accommodation, and the main body is expected to arrive in July.”

Egyptian

  • Engineering company
    • Dec. 24, 2007:
      • “…will deploy by mid-Feb. 2008”
    • Feb. 14, 2008:
      • “…(equipment) is currently being loaded and shipped”
    • Mar. 25, 2008:
      • “…scheduled to arrive in El Geneina on 24 Mar.”
    • Apr. 14, 2008:
      • “…started deploying in Mar. with the arrival of (its) equipment. While a portion of the equipment has arrived in Darfur, much of it has yet to leave Port Sudan. The personnel…are expected to arrive in Apr. 2008.”
    • May 9, 2008:
      • “…the equipment…which is currently in transit will arrive in El Fasher in the coming weeks.”
    • June 17, 2008:
      • “The majority of the equipment…is also in transit to El Fasher.”
      • “…the deployment of the advance parties…originally anticipated for June, is likely to be delayed until July.”
    • July 7, 2008:
      • “As of 15 June, a large portion of the contingent-owned equipment…had arrived in El Fasher, where the Company is due to deploy in July. Much of the equipment was damaged en route to El Fasher, however, and the deployment date of the company will depend upon the ability of the maintenance party to repair it quickly.”
  • Medium transport unit
    • Dec. 24, 2007:
      • “…will deploy by mid-Feb. 2008”
    • Feb. 14, 2008:
      • “…(equipment) is currently being loaded and shipped”
    • Mar. 25, 2008:
      • “…scheduled to arrive in Nyala on 16 Mar.”
    • Apr. 14, 2008:
      • “…started deploying in Mar. with the arrival of (its) equipment. While a portion of the equipment has arrived in Darfur, much of it has yet to leave Port Sudan. The personnel…are expected to arrive in Apr. 2008.”
    • May 9, 2008:
      • “The movement by road of the equipment…from Port Sudan to Nyala has yet to commence…”
    • June 17, 2008:
      • “…the equipment…arrived in Port Sudan on 31 Jan. 2008, but only 15% of it had arrived in Nyala as at 29 May.”
      • “…the deployment of the advance parties…originally anticipated for June, is likely to be delayed until July.”
    • July 7, 2008:
      • “Owing to delays in the transportation of contingent-owned equipment…units are not expected to arrive in Nyala until late Aug.”
  • Signals company
    • Dec. 24, 2007:
      • “…will deploy by mid-Feb. 2008”
    • Feb. 14, 2008:
      • “…(equipment) is currently being loaded and shipped”
    • Apr. 14, 2008:
      • “…started deploying in Mar. with the arrival of (its) equipment. While a portion of the equipment has arrived in Darfur, much of it has yet to leave Port Sudan. The personnel…are expected to arrive in Apr. 2008.”
    • July 7, 2008:
      • “As a result of related delays, the only deployment to be completed since the transfer of authority has been the Egyptian Signals Company, which deployed in May 2008.”
  • Battalion
    • Mar. 25, 2008:
      • “…the Egyptian battalion is expected to deploy its lead company group to Nyala on 19 Mar., the remainder of the battalion completing its deployment on 15 Apr.”
    • Apr. 14, 2008:
      • “The advance-party personnel…is expected to arrive in Apr., and the main body in May 2008.”
    • May 9, 2008:
      • “The equipment of the advance party…was flown into Darfur on 15 Mar. and is en route to its base in Northern Darfur.”
    • June 17, 2008:
      • “Pending the completion of the camp construction, UNAMID plans to airlift the equipment from El Obeid and deploy the advance party…by early July.”
    • July 7, 2008:
      • “The advance party…is expected to deploy by the end of July…”
  • Formed police units
    • June 17, 2008:
      • “…it is expected that…Egypt will finalize deployment preparations in the coming weeks, with a view to deploying (its) formed police units to…Greida (Southern Darfur)…”

Bangladeshi

  • Logistics company
    • Dec. 24, 2007:
      • “…deploy by the end of Mar. 2008”
    • Feb. 14, 2008:
      • “…(equipment) is currently being loaded and shipped”
    • Apr. 14, 2008:
      • “The equipment and vehicles…arrived in the Sudan and are expected to reach Nyala…in Apr., with (its) personnel following in May 2008.”
    • June 17, 2008:
      • “…only 14% of the equipment…which arrived in Port Sudan on 21 Feb., was in Nyala at time of drafting.”
      • “…the deployment of the advance parties…originally anticipated for June, is likely to be delayed until July.”
    • July 7, 2008:
      • “Owing to delays in the transportation of contingent-owned equipment…units are not expected to arrive in Nyala until late Aug.”
  • Police unit
    • Feb. 14, 2008:
      • “Currently only the unit from Bangladesh is in the mission area, although the seven-week delay…prevented the Bangladeshi unit from becoming operational before the end of Jan. 2008.”

Pakistani

  • Engineers company
    • Dec. 24, 2007:
      • “…deploy by the end of Mar. 2008”
  • Level III hospital
    • Dec. 24, 2007:
      • “…deploy by the end of Mar. 2008”
  • Aerial reconnaissance unit
    • Dec. 24, 2007:
      • “…deploy by the end of Mar. 2008”

Nigerian

  • Level II hospital
    • Dec. 24, 2007:
      • “…deploy by the end of Mar. 2008”
    • Feb. 14, 2008:
      • “…(equipment) is currently being loaded and shipped”
    • Mar. 25, 2008:
      • “…scheduled to arrive in El Geneina on 5 Apr.”
    • Apr. 14, 2008:
      • “The equipment and vehicles…arrived in the Sudan and are expected to reach…El Geneina…in Apr., with (its) personnel following in May 2008.”
  • Formed police units
    • June 17, 2008:
      • “…it is expected that Nigeria…will finalize deployment preparations in the coming weeks, with a view to deploying (its) formed police units to El Geneina…”

Nepalese

  • Police officers and police units
    • Dec. 24, 2007:
      • “…by Feb. 2008”
    • Mar. 25, 2008:
      • “…major equipment arrived in Port Sudan on 18 Feb.”
    • Apr. 14, 2008:
      • “The equipment of the Nepalese formed police unit arrived in Port Sudan on 18 Feb, and the unit’s main body will deploy once the equipment arrives in Nyala. It is estimated that the five formed police units will be deployed in Darfur by the end of July 2008.”
    • May 9, 2008:
      • “The equipment…which arrived in Port Sudan on 18 Feb. is still in transit to Nyala.”
    • June 17, 2008:
      • “The equipment…arrived in Port Sudan on 18 Feb., but only 11% of the equipment had arrived in Nyala as at 25 May.”
    • July 7, 2008:
      • “The contingent-owned equipment…has arrived at Port Sudan and the main bodies are expected to deploy by Aug. provided the equipment is transported in time…

Ethiopian

  • Battalion
    • Mar. 25, 2008:
      • “The Ethiopian battalion’s lead company group is scheduled to arrive in El Fasher on 7 Apr. The remainder of the battalion will complete its deployment of 15 May.”
    • Apr. 14, 2008:
      • “The equipment and personnel of the advance party…is expected to be flown into El Fasher in Apr. It is anticipated that the main body’s equipment will arrive in the Sudan in Apr. and in Darfur in early May, with the personnel arriving in May 2008.”
    • May 9, 2008:
      • “The movement of the equipment of the advance party…began on 2 Apr. and the equipment is expected to arrive in Darfur by mid-May. The advance party…will deploy in May, and the main body is due to begin to deploy in June.”
    • June 17, 2008:
      • “The equipment of the advance party…is en route from El Fasher to Kulbus (Western Darfur).”
    • July 7, 2008:
      • “The advance party…is expected to move forward in July. The Operation is also using all means possible to accelerate the movement of the…equipment to Kulbus in order to permit the deployment of the main body before Oct. 2008.”
  • Transport company
    • July 7, 2008:
      • “The final contingent-owned equipment…arrived in Port Sudan in late Apr.; however, 72% of the contingent-owned equipment is still in Port Sudan awaiting movement into the mission area.”
  • Logistics company
    • July 7, 2008:
      • “The final contingent-owned equipment…arrived in Port Sudan in late Apr.; however, 72% of the contingent-owned equipment is still in Port Sudan awaiting movement into the mission area.”

Indonesian

  • Formed police unit
    • May 9, 2008:
      • “The equipment…arrived in Port Sudan on 25 Apr. but has not yet been released from Customs.”
    • June 17, 2008:
      • “The equipment…arrived in Port Sudan on 25 Apr. and has been cleared by the Sudanese customs authorities. However, the Indonesian equipment has not left for Zam Zam (Northern Darfur), owing to a breach of contract by the local companies contracted to move the equipment.”
    • July 7, 2008:
      • “The contingent-owned equipment…has arrived at Port Sudan and the main bodies are expected to deploy by Aug. provided the equipment is transported in time and the land required…is provided.”

Sudanese

  • Land
    • Mar. 25, 2008:
      • “The Government has still not provided UNAMID with the land it requires in El Geneina, Western Darfur.”
    • Apr. 14, 2008:
      • “…(UNAMID) has been provided land in El Geneina…however, to date the mission still has not received land in Seleia…”
    • June 17, 2008:
      • “…the land required to expand the Kulbus camp has not yet been appropriated by the Government. UNAMID has requested the Government to allocate land in Kulbus and all other locations.”
      • “Land for new camps must also be obtained and prepared in Korma, Seleia, Buram, Habila and Um Dukhum. In its request of 9 May, UNAMID sent the Government a comprehensive list of the land required in a total of 35 locations; a formal response has not yet been received.”
Share:
  • StumbleUpon
  • del.icio.us
  • Facebook
  • Mixx
  • Reddit
  • Google Bookmarks
  • email
  • Digg
  • NewsVine
  • TwitThis

The opinions expressed here are those of the author(s) and do not necessarily reflect the position of the Save Darfur Coalition.

Leave a Reply

You must be logged in to post a comment.

Donate Now to the Save Darfur Coalition

 Subscribe in a reader

.